Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 23380 REL 7: 201003800 EXP LOLO CREEK PERMANENT WEIR DESIGN & CONSTRUCTION
Project Number:
Title:
Lolo Creek Permanent Weir Construction
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
23380 REL 7
Contract Title:
201003800 EXP LOLO CREEK PERMANENT WEIR DESIGN & CONSTRUCTION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
The Lolo Creek Permanent Weir Design and Construction Project (Lolo Permanent Weir) is being implemented by NPT and BPA to replace the current adult trapping system located on Lolo Creek, near Weippe, Idaho.  As a part of the required collection and monitoring program, NPT has been operating a manually placed picket weir, supported by tripods placed in the stream bed. The existing system does not currently meet NPT’s needs with regard to effectiveness, durability, and safety.  In many cases, NPT is unable to trap fish when flows are greater than 500 cfs due to an inability to deploy the pickets at higher flows. When already in place, an increase of flows above 500 cfs has resulted in significant damage and loss of trapping effectiveness. Personnel safety has been at risk during these conditions when attempting to deploy the system too early or when trying to salvage the trap after high flow events.

The new collection system will be designed to overcome the challenges currently identified at the site in addition to improving overall collection efficiency and trap and transfer operations. The new weir will be a permanent system and will eliminate the need for annual construction efforts. When the weir is not in operation, it will remain in the river in the down position.  Fish collection and monitoring provisions will be facilitated by a landside holding area. With the holding area placed near the shoreline, access and durability of the system will be markedly improved and will allow operations personnel greater efficiency and safety.
Account Type(s):
Expense
Contract Start Date:
08/16/2010
Contract End Date:
06/30/2013
Current Contract Value:
$403,043
Expenditures:
$403,043

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Rossana Callejas Bonneville Power Administration No Interested Party rxcallejas@bpa.gov (503) 230-7558
Ed Donahue Fishpro, Inc. No Supervisor ed.donahue@hdrinc.com (253) 858-5262
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Sherry Jeffery HDR Engineering, Inc. Yes Contract Manager sherry.jeffery@hdrinc.com (253) 858-5262
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Donald Rose Bonneville Power Administration Yes Interested Party dlrose@bpa.gov (503) 230-3796
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Gregory (HDR) Wolfe HDR Engineering, Inc. No Interested Party gregory.wolfe@hdrinc.com (509) 546-2071


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits/Authorizations Acquired and submitted to BPA A: 165. Environmental Compliance 06/30/2013 06/30/2013
QA/QC Submittals B: 122. QA/QC Reviews 06/30/2013 06/30/2013
Alternatives Feasibility Assessment C: 174. Alternatives Feasibility Assessment 09/30/2011 09/30/2011
Pre-design and Permitting Requirements Summary Memo D: 174. Predesign and Permitting Requirements Summary Memo 06/30/2013 06/30/2013
Lolo Creek Weir Final Design E: 175. Final Design 06/30/2013
Management of Project & Year End Accrual G: 119. Manage Project and Subconsultants 06/30/2013 06/30/2013
Workshop with Stakeholders I: 191. Workshop with Stakeholders 06/30/2013 06/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 174 Produce Plan
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 08/15/2010
B 122 QA/QC Reviews 08/15/2010
C 174 Alternatives Feasibility Assessment 08/15/2010
D 174 Predesign and Permitting Requirements Summary Memo 08/15/2010
E 175 Final Design 08/15/2010
F 132 NO REPORT REQUIRED 08/15/2010
G 119 Manage Project and Subconsultants 08/15/2010
H 185 Periodic Status Reports for BPA 08/15/2010
I 191 Workshop with Stakeholders 08/16/2010